Normalize duty before price
Source-based explanationCaterpillar’s rating paper gives different conditions for its backup, prime and continuous categories. Two quotations with the same headline kVA may therefore describe different operating duties. [1]
Use & limitsThis comparison method does not impose Cat definitions on other manufacturers.
What to ask next
Editorial checklist
- Keep original rating labels and ask each supplier for its defining document.
- Put model, rating, kWe, kVA, PF, Hz, voltage and site conditions on one comparison line. Mark unresolved fields explicitly.
Separate a conversion from a capability claim
Source-based explanationAGN 087 distinguishes active and apparent electrical power. At an assumed PF of 0.8, 250 kVA corresponds arithmetically to 200 kWe; that calculation alone does not prove a quoted set can deliver the required duty. [2]
Use & limitsThe stated PF is an assumption for the arithmetic example, not a fixed characteristic of every load.
What to ask next
Editorial checklist
- Compare the exact engine, alternator and controller along with the enclosure and accessories.
- Ask whether optional items in the brochure are included in the priced bill of supply. Retain a written deviation list.
Make totals and tests comparable
Source-based explanationOur editorial comparison worksheet should separate equipment, site works, logistics and service. Cummins describes load-bank testing with written results; ask each seller what its proposed test actually demonstrates. [3]
Use & limitsA resistive exercise record is not automatically evidence of every reactive-load or transient requirement.
What to ask next
Editorial checklist
- Match test load, duration, acceptance limits, witness arrangements and report scope.
- Align currency, quantity, named delivery place, quote expiry and warranty start. Keep unmatched offers in a clarification list rather than averaging their prices.
Output, duty and site conditions
Model, components and delivery basis
Entity, documents and test scope
Clarify exceptions before comparing
Sources, dates and scope
4 references. Each record keeps its own review date. A manufacturer disclosure is not an independent test; a retrieval date is not a price-effective date. Hover, focus or tap a numbered reference to inspect its source.
- [1]Manufacturer technical paperwww.cat.com
Caterpillar · Generator Ratings: Prime, Standby Power and More ↗
Use & limits
Cat rating definitions; retain the named category and its conditions. Do not map every commercial label directly to an ISO designation.Sections Standby, Emergency Standby Power, Prime, Continuous
Publication date not stated · Web edition; publication date not stated · Reviewed 2026-10-22View the recorded evidence
Cat distinguishes backup duty, varying-load prime duty and constant-load continuous duty, with operating limits for each.
- [2]Alternator application notewww.stamford-avk.com
STAMFORD | AvK · AGN 087: Power Factor ↗
Use & limits
Actual load power factor is not fixed at 0.8; a unit conversion does not validate engine output or size a complete set.PDF p.1, Definitions; subsequent capability discussion
Publication date not stated · Issue C; date not established · Reviewed 2026-10-22View the recorded evidence
Power factor relates active kWe to apparent kVA. Conventional alternator ratings use 0.8 lagging power factor.
- [3]Manufacturer service explanationwww.cummins.com
Cummins · Load Bank Performance Testing ↗
Use & limits
Service explanation, not a complete FAT procedure, SAT protocol or current NFPA standard.Load Bank Performance Testing, main text
Publication date not stated · Web edition; publication date not stated · Reviewed 2026-10-22View the recorded evidence
Load banks apply controlled electrical loads; Cummins describes resistive exercise and written performance records.
- [4]Supplier marketplace disclosurewww.alibaba.com
Alibaba · Jiangsu Wellpower WP-C200GF listing ↗
Use & limits
One marketplace listing; the advertised price is a tier range, not a dated firm offer.Named source page / model table; see recorded evidence
Publication date not stated · Original public record · Reviewed 2026-10-29View the recorded evidence
WP-C200GF: Cummins NT855-GA; 200 kW / 250 kVA; 50 Hz; advertised US$11,500–16,000; MOQ 1 set.





